Guide · GCC · Vision 2030

PMO Dashboard Examples for GCC Giga-Projects

Practical PMO dashboard layouts, KPI selection and reporting cadences — tuned for UAE, Saudi Vision 2030 and Gulf giga-project pace. Every example maps to a template you can implement in SiteAxis or StratexHub.

1. Executive PMO dashboard (one-page brief)

The board or steerco brief. One page, ten tiles. Built for ministers, PIF portfolio committees and CEO reviews — where every KPI must be defensible on the spot.

  • Portfolio schedule adherence (SPI) and cost performance (CPI).
  • Benefits realised (SAR) vs. plan.
  • Strategic alignment % against Vision 2030 / VRP pillars.
  • Top 5 risks with mitigation owner and due date.
  • HSE headline: incidents, LTIFR, safe man-hours.
  • Localisation / Saudization % where applicable.
  • Stage-gate approvals pending governance.
  • Cash: committed vs. spent vs. forecast.
  • ESG / Net-Zero contribution (UAE, KSA).
  • AI insight tile — 1 sentence, natural language.

2. Programme PMO dashboard (package rollup)

For programme directors managing dozens of concurrent packages across NEOM, Diriyah, Red Sea, Qiddiya, Expo City Dubai or the UAE Net-Zero delivery portfolio. Focus is on where to intervene this week.

  • Package heatmap: schedule × cost × risk, RAG-coloured.
  • Contractor performance leaderboard.
  • Earned value (BCWP, ACWP, BCWS) per package.
  • RFI / NCR / snag ageing.
  • Milestones due in the next 30 days.
  • Interface risks between packages.

3. Construction PMO dashboard (site level)

The field-first view — the layer SiteAxis is purpose-built for. Refreshed daily from the site, so consultants and the client PMO see the same numbers as the contractor.

  • Manpower on site vs. plan (by trade).
  • Daily progress % against baseline.
  • HSE observations, near-misses and incidents.
  • Materials on site / to be delivered.
  • RFIs, NCRs and snag closure velocity.
  • Weather / stoppage log.

4. Strategy Management Office (SMO) dashboard

The SMO layer — powered by StratexHub. Where the enterprise translates Vision 2030 pillars into initiatives, OKRs and benefits.

  • Strategy map with cascading OKRs.
  • Balanced scorecard per pillar.
  • Initiative health (green / amber / red) with owner.
  • Benefits realisation curve.
  • Governance calendar: committees, approvals, RACI.
  • Stratex AI copilot insight.

KPI selection for Vision 2030 programmes

A KPI earns its place on a Vision 2030 dashboard only if it is: (1) mapped to a VRP pillar or ministerial KPI, (2) refreshed on a defensible cadence, and (3) owned by a named executive. Avoid vanity KPIs — every ministerial reviewer asks who owns the number and how it was calculated.

Reporting cadences that work in the GCC

  • Daily — site data, HSE, manpower (SiteAxis).
  • Weekly — project status, RFI/NCR ageing, risks.
  • Monthly — portfolio, benefits, EPMO review, ministerial brief.
  • Quarterly — board / PIF / VRP steerco.

Common pitfalls

  • Ten dashboards, ten definitions of the same KPI.
  • Slides re-drawn manually every month — always ship stale.
  • English-only briefs going to Arabic ministerial reviewers.
  • Site data trapped in a contractor spreadsheet, not the client PMO.